Send Message
Home ProductsHigh Speed Feeder

Double Head Material Frame High Speed Feeder Stainless Steel Door Stamping

Double Head Material Frame High Speed Feeder Stainless Steel Door Stamping

  • Double Head Material Frame High Speed Feeder Stainless Steel Door Stamping
  • Double Head Material Frame High Speed Feeder Stainless Steel Door Stamping
  • Double Head Material Frame High Speed Feeder Stainless Steel Door Stamping
  • Double Head Material Frame High Speed Feeder Stainless Steel Door Stamping
Double Head Material Frame High Speed Feeder Stainless Steel Door Stamping
Product Details:
Place of Origin: Guangdong, China (Mainland)
Brand Name: RUIHUI
Certification: CE, ISO certification
Payment & Shipping Terms:
Minimum Order Quantity: 1 Set
Packaging Details: Wooden Box or Vacuum Packing
Delivery Time: 30 work days
Payment Terms: L/C, D/A, D/P, T/T, Western Union, MoneyGram
Supply Ability: 30 Sets Per Month
Contact Now
Detailed Product Description
Stock Width(mm): 70-1000 Stock Thickness(mm): 0.6-6.0
Line Speed(m/min): 16~24 Coil Weight(Kg): 7000
Work Roll Number(Pcs): Upper 6/lower 5 Main Motor(Kw): AC 11.0
Warranty Period: 12 Months Max.Coil O.D.(mm): 1400
Coil I.D.(mm): 508 Feed Length(mm): ~500*
Mandrel Expansion: Hydrauilc Reel Motor(kw): 2.2
Operating Air(Mpa): 0.49
High Light:

mechanical roll feeder

,

roll feeder machine

 

Double Head Material Frame High Speed Feeder Stainless Steel Door Stamping

 

www.ruihui.net

The actual working process of the double-head material rack is as follows:

 

1. Arrange the double-head material frame at the appropriate position of the stamping production line, so that the material frame No. 1 reel is at the winding station, and under the action of the rotary expansion and contraction cylinder of the No. 1 reel, pull the pull rod to drive the pyramid sleeves. The upper tray is retracted to form a minimum circle.

 

Use the forklift or the driving to feed the coil into the No.1 reel of the material rack, cut the strap, open the driving device of the material frame pressing roller, push the swing arm to swing, and press the rubber roller on the material swing arm downward. The head of the belt drives the rotary expansion and contraction cylinder of the No. 1 reel, pushes the rod, and drives the tray of the pyramid sleeve to extend to expand the coil.

 

2. Install the stopper type A iron on the outside of the double-head material frame, and turn on the gear motor to make the double-head material frame rotate slowly, open the driving device of the pressing arm, and push the swing arm to swing.

 

The rubber roller on the swing arm is lifted up to loosen the head of the steel strip, so that the strip head is introduced into the pinch roller through the guide plate to establish tension, and the strip enters the subsequent leveler or feeder.

 

At the same time, the second roll of the double-head material frame is transferred to the winding station, and the process in the step is repeated, and the second roll of the material frame is rolled up and the unwinding process is detected.

 

3. After the first reel of the double-head material frame is unrolled, the locking device of the double-head material frame rotary platform is loosened, the rotation of the slewing bearing is rotated, and the material frame reel is transferred to the winding station for winding up and detecting the unwinding. operating.

 

The second reel of the material frame is transferred to the unwinding station, and the support arm of the outer supporting device is supported upward to support the front end of the second reel, and the outer ring gear coupling is inserted into the second volume under the push of the hydraulic cylinder of the main transmission system. The inner gear sleeve supported by the front part of the cylinder is opened, and the geared motor is turned on, so that the double-head material frame second drum is slowly rotated.

 

Open the driving device of the pressing drum, push the swing arm to swing, lift the rubber-coated stick on the swing arm upwards to loosen the head of the steel strip, open the coil, and lead the lead-in roller through the guide plate to establish the tension, and the strip enters. In the subsequent leveling machine or feeder, the second reel continues to unwind, thereby achieving continuous unwinding of the material rack without stopping.

 

products:

feeder

feeder

 

specifications

Model Stock Width (mm) Coil Weight (kg) Motor
(kw)
Pressing Arm Coiling block expansion mode Material ID (mm) Material OD (mm)
ME-200 70-200 500 0.375 Pneumatic Manual/Hydraulic 508 930
ME-300 70-300 800 0.75 Pneumatic Manual 508 930
ME-400 70-400 1000 0.75 Pneumatic Manual/Hydraulic 508 930
ME-500 70-500 1500 1.5 Pneumatic Manual 508 1200
ME-600 100-600 3000 1.5 Pneumatic Manual 508 1200
ME-800 100-800 5000 2.2 Pneumatic Manual 508 1200
 

 

FAQ:

Q1:What kinds of machines do you have?
Our main products are:Nc Servo Roll Feeder,Uncoiler, Straightener, 3 in1 Straightener Feeder,Transfer systems,Press Feeding Line., etc
Q2:Is your equipment standard or customized?
Both, we can OEM & ODM with customers.
Q3:What are your equipments certification?
All our items are coming with CE certifications.
Q4:How did your company's quality system work?
"QUALITY IS OUR CULTURE" Our quality is not the best in the world, and the price is not the cheapest. But we can provide you excellent products to defeat your competitors.
Q5:How long is the warranty period of the machine?
We offer free service with a warranty period of one year, If it is operate in reasonable, the machine can be used more than 10 years.
Q6: Is it possible to be a foreign agent and distributor?
If you are confidence and excellent service for after-sales, then welcome to be our agents or distributors all over the world.
Q7:What's your payment?
T/T,D/P,L/C,Western Union., etc
Q8:What's the delivery?
"TIME IS GOLD" for you and for us, so we have professional team work and production line can make nice quality in short time.

 

Double Head Material Frame High Speed Feeder Stainless Steel Door Stamping 2

1. Pre-Sales Service:We have professional designers to meet the different requirement of our customers.
2. After-Sales service:We have an efficient team to meet 24*7 all day service.
3. Full-Service:Actively cooperate with customers to deal with problems in equipment using.
4. Engineers can provide service machinery overseas.

Contact Details
GUANGDONG RUIHUI INTELLIGENT TECHNOLOGY CO., LTD.

Contact Person: Calin Deng

Tel: 13826917409

Fax: 86-769-89296723

Send your inquiry directly to us
Other Products